When I arrived at this home, the bathroom had been completely gutted right down to the studs and subfloor and the clients had run out of energy and interest, so I was asked to finish the job while they went away on vacation.
A three piece tub insert was installed (which by the way is one of the most frustrating tasks ever), the bathroom was tiled and painted, a new vanity and toilet installed and a new mirror and light fixture.



